The Non-MSBA Building Option

The Non-MSBA Building Option

The School Building Committee met on 9/29/14 and established the Non-MSBA Building Plan Subcommittee. Details on the charge and membership can be found here.

 

This Subcommittee met from October 20, 2014 and January 5, 2015, reviewed documents, and developed a Draft Non-MSBA Report 1/13/15 v. 5 Documents they reviewed are listed in the Appendix of this report, and can be found below:

 

Appendix I – Order of Magnitude Cost Options for District Funded Upgrade

Appendix II – NEASC Focused Visit Evaluation Report, May 5-7, 2014

Appendix III– Odeh Engineering Seismic Evaluation Addendum, November 17, 2012

Appendix IV – Kaestle Boos List of Recommendations

Appendix V – Odeh Engineers Structural Evaluation, 2012 Update

Appendix VI – Universal Environmental Consultants HAZMAT Survey Report, May 6-10, 2013

Appendix VII – Siemens Existing MEP Conditions Report (undated)

Appendix VIII Pt. 1 – Kaestle Boos Existing Conditions Survey Parts 1 and 2, November 4, 2013

Appendix VIII Pt. 2

Appendix IX – Daedalus Base Option Cost Estimate, August, 2013

Appendix X a – Education Program Plan, approved by School Committee September 10, 2014

Appendix X b - Ed Bouquillon Presentation on Education Program Plan

Appendix X c - Education Program Plan submitted to DESE

Appendix XI – Subcommittee Minutes and Meeting Dates

 

Roof Evaluations Aug.- Sept., 2014

 

Additional information related to this Option can be found below:

 

Construction Project Trigger Points

Evaluation of Existing Conditions (Executive Summary Preliminary Design Program 3.1.4a Nov., 2013)

 

The "Go It Alone" Option

Repairs Only Breakdown