Skip To Main Content

Module 6: Detailed Design

With the September 20, 2016 District Wide Election vote, and the strong support of the Massachusetts Building Authority, the Minuteman School Building Committee moves into Module 6. See Timeline and Schedule.

 

MSBA Module 6 Guidelines