Skip To Main Content

Module 4: Schematic Design

With the unanimous vote of the MSBA on August 6, 2015, to endorse the building of a new 628-student Minuteman High School on District land adjacent to the existing school, the District has been approved to move forward into Module 4: Schematic Design. The Team developed the Schematic Design, and it was submitted to MSBA on December 1, 2015. The MSBA Board considered the proposed project on January 27, 2016.

 

MSBA Module 4 Guidelines

 

Module 4 Execution Schedule 10/19/15

 

LEED Credit Descriptions for Building Design and Construction