Module 4: Schematic Design
With the unanimous vote of the MSBA on August 6, 2015, to endorse the building of a new 628-student Minuteman High School on District land adjacent to the existing school, the District has been approved to move forward into Module 4: Schematic Design. The Team developed the Schematic Design, and it was submitted to MSBA on December 1, 2015. The MSBA Board considered the proposed project on January 27, 2016.
Module 4 Execution Schedule 10/19/15
LEED Credit Descriptions for Building Design and Construction