The School Building Project

  • 2016-17
    After the positive vote approving bonding for the Building Project via 16n (District Wide Ballot) on September 20, 2016, the District moved into Module 6 of the MSBA Project process, Detailed Design.  The Design Team, consisting of the Owner's Project Manager (Skanska), the Architects (Kaestle Boos), and the Construction Manager at Risk (Gilbane Building Co.), met regularly throughout the year with members of the Administration and the staff to develop the Design. The Design Development document was submitted to MSBA on March 14, 2017. 
     
    Meetings continue with the Town of Lincoln as part of the permitting process, and once that is complete, a schedule will be developed.
     
    More detail on the School Building Project can be found here.